Scheduling under a Non-renewable Resource Constraint
From MaRDI portal
Publication:3983497
DOI10.1057/jors.1991.152zbMath0737.90036OpenAlexW2062233298MaRDI QIDQ3983497
Aysegül Toker, Nesim Erkip, Suna Kondakci
Publication date: 27 June 1992
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/jors.1991.152
Related Items (14)
Polynomial algorithms for single machine scheduling problems with financial constraints ⋮ Bi-objective optimization algorithms for joint production and maintenance scheduling under a global resource constraint: application to the permutation flow shop problem ⋮ Minimizing makespan on a single machine with release dates and inventory constraints ⋮ Approximation schemes for single machine scheduling with non-renewable resource constraints ⋮ Resource constrained scheduling simulation model for alternative stochastic network projects. ⋮ A multivariate complexity analysis of the material consumption scheduling problem ⋮ Approximation schemes for parallel machine scheduling with non-renewable resources ⋮ A PTAS for a resource scheduling problem with arbitrary number of parallel machines ⋮ Reductions between scheduling problems with non-renewable resources and knapsack problems ⋮ Single machine scheduling problems with financial resource constraints: some complexity results and properties ⋮ On single machine scheduling with resource constraint ⋮ Minimizing total weighted completion time on a single machine subject to non-renewable resource constraints ⋮ New complexity and approximability results for minimizing the total weighted completion time on a single machine subject to non-renewable resource constraints ⋮ Approximability of scheduling problems with resource consuming jobs
This page was built for publication: Scheduling under a Non-renewable Resource Constraint