Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

A single-machine problem with multiple criteria

From MaRDI portal
Publication:3987786
Jump to:navigation, search

DOI<721::AID-NAV3220380507>3.0.CO;2-4 10.1002/1520-6750(199110)38:5<721::AID-NAV3220380507>3.0.CO;2-4zbMath0755.90045OpenAlexW2082912437MaRDI QIDQ3987786

Ali S. Kiran, Ali Tamer Ünal

Publication date: 28 June 1992

Full work available at URL: https://doi.org/10.1002/1520-6750(199110)38:5<721::aid-nav3220380507>3.0.co;2-4


zbMATH Keywords

single machinemultiple criteriatotal flow timenumber of tardy jobslower bound on the number of efficient sequences


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35) Computational methods for problems pertaining to operations research and mathematical programming (90-08)


Related Items

Bicriteria scheduling with vacations on a single machine ⋮ Single-machine hierarchical scheduling with release dates and preemption to minimize the total completion time and a regular criterion ⋮ A bicriteria approach to the two-machine flow shop scheduling problem ⋮ New solution methods for single machine bicriteria scheduling problem: Minimization of average flowtime and number of tardy jobs ⋮ Using genetic algorithms for single-machine bicriteria scheduling problems



Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:3987786&oldid=12042650"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 30 January 2024, at 01:02.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki