Scheduling modular projects on a bottleneck resource
From MaRDI portal
Publication:398901
DOI10.1007/s10951-012-0294-9zbMath1297.90038OpenAlexW2000209706MaRDI QIDQ398901
Kris Coolen, Roel Leus, Fabrice Talla Nobibon, Wenchao Wei
Publication date: 18 August 2014
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10951-012-0294-9
Related Items (12)
Project planning with alternative technologies in uncertain environments ⋮ Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project ⋮ State-Variable Modeling for a Class of Two-Stage Stochastic Optimization Problems ⋮ Project scheduling under the threat of catastrophic disruption ⋮ Maximizing the expected net present value of a project with phase-type distributed activity durations: an efficient globally optimal solution procedure ⋮ Moments and distribution of the net present value of a serial project ⋮ Sequential testing of \(n\)-out-of-\(n\) systems: precedence theorems and exact methods ⋮ A branch‐and‐bound algorithm for scheduling of new product development projects ⋮ Maximum probabilistic all-or-nothing paths ⋮ On the complexity of project scheduling to minimize exposed time ⋮ Stochastic project scheduling with hierarchical alternatives ⋮ A Genetic Algorithm for Scheduling Alternative Tasks Subject to Technical Failure
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- On generating all maximal independent sets
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- Project scheduling under uncertainty: survey and research potentials
- Sequential testing of complex systems: a review
- Executing production schedules in the face of uncertainties: a review and some future directions
- Diagnosing double regular systems
- Scheduling Markovian PERT networks to maximize the net present value
- Rangen: A random network generator for activity-on-the-node networks
- Rescheduling manufacturing systems: A framework of strategies, policies, and methods
- Sequencing with Series-Parallel Precedence Constraints
- Optimal Testing Procedures for Special Structures of Coherent Systems
- The Recognition of Series Parallel Digraphs
- Markov and Markov-Regenerative <scp>pert</scp> Networks
- Some Reliability Fault-Testing Models
This page was built for publication: Scheduling modular projects on a bottleneck resource