A cutting and scheduling problem in float glass manufacturing
From MaRDI portal
Publication:398905
DOI10.1007/S10951-013-0335-ZzbMath1297.90055OpenAlexW2060756775MaRDI QIDQ398905
Byungsoo Na, Shabbir Ahmed, Joel S. Sokol, Nemhauser, George I.
Publication date: 18 August 2014
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10951-013-0335-z
Related Items (2)
No-wait flowshop scheduling problem with two criteria; total tardiness and makespan ⋮ A survey of scheduling problems with no-wait in process
Cites Work
This page was built for publication: A cutting and scheduling problem in float glass manufacturing