Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

A cutting and scheduling problem in float glass manufacturing

From MaRDI portal
Publication:398905
Jump to:navigation, search

DOI10.1007/S10951-013-0335-ZzbMath1297.90055OpenAlexW2060756775MaRDI QIDQ398905

Byungsoo Na, Shabbir Ahmed, Joel S. Sokol, Nemhauser, George I.

Publication date: 18 August 2014

Published in: Journal of Scheduling (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/s10951-013-0335-z


zbMATH Keywords

schedulingcuttinghybrid flow shopglasscyclic schedulefloat line


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35)


Related Items (2)

No-wait flowshop scheduling problem with two criteria; total tardiness and makespan ⋮ A survey of scheduling problems with no-wait in process




Cites Work

  • Unnamed Item
  • Performance of scheduling algorithms for no-wait flowshops with parallel machines
  • Sequencing in an Assembly Line with Blocking to Minimize Cycle Time
  • Bounds on Multiprocessing Timing Anomalies
  • Scheduling




This page was built for publication: A cutting and scheduling problem in float glass manufacturing

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:398905&oldid=12269760"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 30 January 2024, at 03:24.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki