The optimal number of used machines in a two-stage flexible flowshop scheduling problem
From MaRDI portal
Publication:398915
DOI10.1007/s10951-013-0343-zzbMath1297.90043OpenAlexW2014405283MaRDI QIDQ398915
Publication date: 18 August 2014
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10951-013-0343-z
Related Items
Hybrid flow shop scheduling with not-all-machines options via local search with controlled deterioration ⋮ Batch scheduling in a two-stage flexible flow shop problem
Cites Work
- A genetic algorithm for hybrid flow-shop scheduling with multiprocessor tasks
- Scheduling of a two-stage differentiation flowshop to minimize weighted sum of machine completion times
- Minimizing the number of machines for scheduling jobs with equal processing times
- Minimizing the number of machines for minimum length schedules
- Batching in single operation manufacturing systems
- The strong NP-hardness of two-stage flowshop scheduling with a common second-stage machine
- Two-stage flowshop scheduling with a common second-stage machine
- Flow shop and open shop scheduling with a critical machine and two operations per job
- Scheduling unrelated parallel machines with optional machines and jobs selection
- Comments on Flow shop and open shop scheduling with a critical machine and two operations per job
- A note on flow-shop and job-shop batch scheduling with identical processing-time jobs
- The hybrid flow shop scheduling problem
- Parallel machine selection and job scheduling to minimize machine cost and job tardiness
- A survey of scheduling problems with setup times or costs
- Minimizing flow-time on a single machine with integer batch sizes
- Optimal two- and three-stage production schedules with setup times included
- A two-stage flow shop scheduling with a critical machine and batch availability
- Flowshop and Jobshop Schedules: Complexity and Approximation
- The Complexity of Flowshop and Jobshop Scheduling
- On the Complexity of Scheduling with Batch Setup Times
- Sequencing a hybrid two-stage flowshop with dedicated machines