JIT purchasing and setup reduction in an integrated inventory model
From MaRDI portal
Publication:3990983
DOI10.1080/00207549208942893zbMath0825.90491OpenAlexW1965142922MaRDI QIDQ3990983
Jack C. Hayya, Seung-Lae Kim, Jae-Dong Hong
Publication date: 28 June 1992
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549208942893
Related Items (8)
Joint investment in quality improvement and setup reduction ⋮ Optimal setup time reduction for a single product with dynamic demands ⋮ A quantitative approach for scheduling activities to reduce set-up in multiple machine lines ⋮ Effects of WIP inventories on integrated production lot sizing in cellular manufacturing ⋮ Investing in ordering cost reduction for integrated inventory systems ⋮ A note on the problem of scheduling a flexible manufacturing system for Just-in-time customers ⋮ Dynamic setup reduction in production lot sizing with nonconstant deterministic demand ⋮ Optimal production cycles, procurement schedules, and joint investment in an imperfect production system
Cites Work
- OR contributions to flexibility improvement in production/inventory systems
- An integrated inventory model for a single product and its raw materials
- Investing in new parameter values in the discounted EOQ model
- An Integrated Inventory Model for a Single Product System
- Setup cost reduction in an inventory model with finite-range stochastic lead times
This page was built for publication: JIT purchasing and setup reduction in an integrated inventory model