Production scheduling in a market-driven foundry: a mathematical programming approach versus a project scheduling metaheuristic algorithm
From MaRDI portal
Publication:400054
DOI10.1007/s11081-011-9157-zzbMath1293.90021OpenAlexW2042998796MaRDI QIDQ400054
Francisco Ballestín, Pedro M. Mateo, Fermín Mallor
Publication date: 20 August 2014
Published in: Optimization and Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s11081-011-9157-z
Related Items (2)
An improved decision support model for scheduling production in an engineer-to-order manufacturer ⋮ Relationship Between β-Efficient Solution and Minimum Risk Efficient Solution for Uncertain Multi-objective Problem
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Multilevel capacitated lotsizing complexity and LP-based heuristics
- When it is worthwhile to work with the stochastic RCPSP?
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- A mathematical programming model and solution for scheduling production orders in Shanghai Baoshan Iron and Steel Complex
- Scheduling subject to resource constraints: Classification and complexity
- DSS for multiobjective project scheduling
- Exact and truncated branch-and-bound procedures for resource-constrained project scheduling with discounted cash flows and general temporal constraints.
- Project scheduling. A research handbook.
- A lot-sizing problem in an automated foundry
- Justification and RCPSP: a technique that pays
- Optimal and heuristic solutions for a scheduling problem arising in a foundry
- Scheduling continuous casting of aluminum using a multiple objective ant colony optimization metaheuristic
- Lot sizing and furnace scheduling in small foundries
- Pre-emption in resource-constrained project scheduling
- Minimizing Total Tardiness on One Machine is NP-Hard
- Scheduling of Project Networks by Job Assignment
- A particle swarm optimization algorithm for hybrid flow-shop scheduling with multiprocessor tasks
- The Complexity of Flowshop and Jobshop Scheduling
- Scheduling the production of rolling ingots: industrial context, model, and solution method
- A review of planning and scheduling systems and methods for integrated steel production
- Project scheduling with multiple modes: A genetic algorithm
This page was built for publication: Production scheduling in a market-driven foundry: a mathematical programming approach versus a project scheduling metaheuristic algorithm