Minimal forecast horizons in equipment replacement models with multiple technologies and general switching costs
From MaRDI portal
Publication:4005861
DOI<487::AID-NAV3220390405>3.0.CO;2-6 10.1002/1520-6750(199206)39:4<487::AID-NAV3220390405>3.0.CO;2-6zbMath0761.90047OpenAlexW3121494956MaRDI QIDQ4005861
Gerhard Sorger, Stanisław Bylka, Suresh P. Sethi
Publication date: 27 September 1992
Full work available at URL: https://doi.org/10.1002/1520-6750(199206)39:4<487::aid-nav3220390405>3.0.co;2-6
Reliability, availability, maintenance, inspection in operations research (90B25) Computational methods for problems pertaining to operations research and mathematical programming (90-08)
Related Items (7)
Forecast horizon of dynamic lot size model for perishable inventory with minimum order quantities ⋮ Network economics and optimal replacement of age-structured IT capital ⋮ Discrete-continuous analysis of optimal equipment replacement ⋮ Hybrid approach to the rational management of machine replacement ⋮ Unnamed Item ⋮ Multiaction maintenance subject to action-dependent risk and stochastic failure ⋮ Integrating equipment investment strategy with maintenance operations under uncertain failures
This page was built for publication: Minimal forecast horizons in equipment replacement models with multiple technologies and general switching costs