Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Order acceptance strategies in a production-to-order environment with setup times and due-dates - MaRDI portal

Order acceptance strategies in a production-to-order environment with setup times and due-dates

From MaRDI portal
Publication:4008522

DOI10.1080/00207549208942959zbMath0825.90541OpenAlexW2003267429MaRDI QIDQ4008522

No author found.

Publication date: 27 September 1992

Published in: International Journal of Production Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1080/00207549208942959




Related Items (19)

Scheduling and order acceptance for the customised stochastic lot scheduling problemMulti-period job selection: Planning work loads to maximize profitAn integrated fuzzy TOPSIS-knapsack problem model for order selection in a bakeryA real-time order acceptance and scheduling approach for permutation flow shop problemsA hybrid policy for order acceptance in batch process industriesExact and heuristic algorithms for order acceptance and scheduling with sequence-dependent setup timesIntegrated and hierarchical systems for coordinating order acceptance and release planningJob selection in a heavily loaded shopOrder acceptance with weighted tardinessGeneralized order acceptance and scheduling problem with batch delivery: models and metaheuristicsA decision support system for order acceptance/rejection in hybrid MTS/MTO production systemsMulti-objective due-date setting in a make-to-order environmentSingle CNC machine scheduling with controllable processing times and multiple due datesOrder acceptance using genetic algorithmsA methodology for planning and controlling workload in a job-shop: a four-way decision-making problemDecision-making support system for human resource allocation in product development projectsA matheuristic for the generalized order acceptance and scheduling problemSelecting jobs for heavily loaded shop with lateness penaltiesPricing and scheduling decisions with leadtime flexibility



Cites Work


This page was built for publication: Order acceptance strategies in a production-to-order environment with setup times and due-dates