Order acceptance strategies in a production-to-order environment with setup times and due-dates
From MaRDI portal
Publication:4008522
DOI10.1080/00207549208942959zbMath0825.90541OpenAlexW2003267429MaRDI QIDQ4008522
No author found.
Publication date: 27 September 1992
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549208942959
Related Items (19)
Scheduling and order acceptance for the customised stochastic lot scheduling problem ⋮ Multi-period job selection: Planning work loads to maximize profit ⋮ An integrated fuzzy TOPSIS-knapsack problem model for order selection in a bakery ⋮ A real-time order acceptance and scheduling approach for permutation flow shop problems ⋮ A hybrid policy for order acceptance in batch process industries ⋮ Exact and heuristic algorithms for order acceptance and scheduling with sequence-dependent setup times ⋮ Integrated and hierarchical systems for coordinating order acceptance and release planning ⋮ Job selection in a heavily loaded shop ⋮ Order acceptance with weighted tardiness ⋮ Generalized order acceptance and scheduling problem with batch delivery: models and metaheuristics ⋮ A decision support system for order acceptance/rejection in hybrid MTS/MTO production systems ⋮ Multi-objective due-date setting in a make-to-order environment ⋮ Single CNC machine scheduling with controllable processing times and multiple due dates ⋮ Order acceptance using genetic algorithms ⋮ A methodology for planning and controlling workload in a job-shop: a four-way decision-making problem ⋮ Decision-making support system for human resource allocation in product development projects ⋮ A matheuristic for the generalized order acceptance and scheduling problem ⋮ Selecting jobs for heavily loaded shop with lateness penalties ⋮ Pricing and scheduling decisions with leadtime flexibility
Cites Work
This page was built for publication: Order acceptance strategies in a production-to-order environment with setup times and due-dates