An Exact Sublinear Algorithm for the Max-Flow, Vertex Disjoint Paths and Communication Problems on Random Graphs
DOI10.1287/opre.40.5.923zbMath0769.90033OpenAlexW1968084791MaRDI QIDQ4015475
Publication date: 5 January 1993
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.40.5.923
randomized algorithmconnected random graphsmaximum-flow maximum-cutNP-hard communication problemsublogarithmic parallel and distributed implementation
Communication networks in operations research (90B18) Stochastic network models in operations research (90B15) Parallel numerical computation (65Y05) Computational methods for problems pertaining to operations research and mathematical programming (90-08)
Related Items (2)
This page was built for publication: An Exact Sublinear Algorithm for the Max-Flow, Vertex Disjoint Paths and Communication Problems on Random Graphs