Scheduling of bus maintenance by the P-graph methodology
From MaRDI portal
Publication:402246
DOI10.1007/S11081-013-9240-8zbMath1294.90015OpenAlexW2010695067MaRDI QIDQ402246
István Heckl, Ferenc Olti, Róbert Adonyi
Publication date: 27 August 2014
Published in: Optimization and Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s11081-013-9240-8
Programming involving graphs or networks (90C35) Transportation, logistics and supply chain management (90B06) Deterministic scheduling theory in operations research (90B35)
Cites Work
This page was built for publication: Scheduling of bus maintenance by the P-graph methodology