Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
scientific article - MaRDI portal

scientific article

From MaRDI portal
Publication:4034337

zbMath0795.68135MaRDI QIDQ4034337

Jinjiang Yuan

Publication date: 16 May 1993


Title: zbMATH Open Web Interface contents unavailable due to conflicting licenses.



Related Items (26)

Minsum scheduling with acceptable lead-times and optional job rejectionApproximation algorithms for minimizing the total weighted tardiness on a single machineOptimizing the half-product and related quadratic Boolean functions: approximation and scheduling applicationsDual Techniques for Scheduling on a Machine with Varying SpeedOptimal restricted due date assignment in schedulingNP-hardness of the single-variable-resource scheduling problem to minimize the total weighted completion timeA fully polynomial approximation scheme for the single machine weighted total tardiness problem with a common due dateJust-In-Time Scheduling with Generalized Due Dates and Identical Due Date IntervalsA dynamic programming algorithm for scheduling problems on earliness award and tardiness penalty with time-dependent processing timeAn FPTAS for the Minimum Total Weighted Tardiness Problem with a Fixed Number of Distinct Due DatesThe symmetric quadratic knapsack problem: approximation and scheduling applicationsMin–max version of single-machine scheduling with generalized due dates under scenario-based uncertaintyJust-in-Time Scheduling with Equal-Size JobsSingle machine scheduling with controllable release and processing parametersScheduling jobs with a V-shaped time-dependent processing timeApproximation algorithms for scheduling problems with a modified total weighted tardiness objectiveBicriteria problems to minimize maximum tardiness and due date assignment cost in various scheduling environmentsSingle machine scheduling to minimize total weighted tardinessOn the complexity of the single machine scheduling problem minimizing total weighted delay penaltyUnary NP-hardness of minimizing total weighted tardiness with generalized due datesExact and heuristic algorithms for minimizing tardy/lost penalties on a single-machine scheduling problemTwo-Machine Ordered Flow Shop Scheduling with Generalized Due DatesA note on the complexity of single-machine scheduling with a common due date, earliness-tardiness, and batch delivery costsA new dynamic programming formulation for scheduling independent tasks with common due date on parallel machinesApproximation algorithms and an FPTAS for the single machine problem with biased tardiness penaltyScheduling with generalized and periodic due dates under single- and two-machine environments






This page was built for publication: