A Horizon-Varying, Zero-One Approach to Project Scheduling
From MaRDI portal
Publication:4058461
DOI10.1287/mnsc.20.6.990zbMath0303.90026OpenAlexW2042583024MaRDI QIDQ4058461
James H. Patterson, Walter D. Huber
Publication date: 1974
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.20.6.990
Related Items
Hierarchical models for multi-project planning and scheduling, Branch-and-Cut-and-Price algorithms for the preemptive RCPSP, Improving electromagnetism algorithm for solving resource allocation problem in stochastic networks, An exact composite lower bound strategy for the resource-constrained project scheduling problem, Going to the core of hard resource-constrained project scheduling instances, Project scheduling and equipment planning with random breakdowns, A prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problem, MIP heuristics for a resource constrained project scheduling problem with workload stability constraints, Resource-constrained project scheduling: A survey of recent developments., A Multiobjective Resource-Constrained Project-Scheduling Problem, Improved tabu search heuristics for the dynamic space allocation problem, A constraint-based perspective in resource constrained project scheduling, A neurogenetic approach for the resource-constrained project scheduling problem, Some efficient multi-heuristic procedures for resource-constrained project scheduling, Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems, Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation, An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem, A multiple-tree search procedure for the resource-constrained project scheduling problem, A robust time-cost-quality-energy-environment trade-off with resource-constrained in project management: a case study for a bridge construction project, The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure, Strong bounds for resource constrained project scheduling: preprocessing and cutting planes, Resource-constrained project scheduling by simulated annealing, Resource constrained project scheduling: Modelling with multiple alternatives, A comparative study of computational procedures for the resource constrained project scheduling problem