scientific article
From MaRDI portal
Publication:4058784
zbMath0302.90002MaRDI QIDQ4058784
Publication date: 1975
Title: zbMATH Open Web Interface contents unavailable due to conflicting licenses.
Programming involving graphs or networks (90C35) Extremal problems in graph theory (05C35) Deterministic network models in operations research (90B10) Research exposition (monographs, survey articles) pertaining to operations research and mathematical programming (90-02) Software, source code, etc. for problems pertaining to operations research and mathematical programming (90-04) Graph theory (05Cxx)
Related Items (11)
Schedule-induced posets ⋮ A continuous linear optimization model for the exact solution of travelling-salesman-problems in connexion with expansion planning of ring networks ⋮ Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production ⋮ Recent advances in temporal analysis of GERT networks ⋮ Stochastic scheduling problems I — General strategies ⋮ Scheduling of project networks ⋮ An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags ⋮ Piecewise algebraic functions ⋮ Multiterminal network flows and applications ⋮ On cyclic sequence types for constructing cyclic schedules ⋮ Solving the transportation problem with mixed constraints
This page was built for publication: