Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Flowshop Sequencing Problem with Ordered Processing Time Matrices - MaRDI portal

Flowshop Sequencing Problem with Ordered Processing Time Matrices

From MaRDI portal
Publication:4058808

DOI10.1287/mnsc.21.5.544zbMath0302.90025OpenAlexW1989809236MaRDI QIDQ4058808

R. Dudek, Milton L. Smith, Shrikant S. Panwalkar

Publication date: 1975

Published in: Management Science (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1287/mnsc.21.5.544




Related Items (33)

Two-machine ordered flowshop scheduling under random breakdownsFlowshop scheduling with dominant machinesMinimizing maximum completion time in a proportionate flow shop with one machine of different speedSingle-machine and two-machine flowshop scheduling with general learning functionsAsymptotic optimality of statistical multiplexing in pipelined processingOUTSOURCING DECISIONS IN m-MACHINE PERMUTATION FLOW SHOP SCHEDULING PROBLEMS WITH MACHINE-DEPENDENT PROCESSING TIMESAn \(O(n^{2})\) algorithm for the variable common due date, minimal tardy jobs bicriteria two-machine flow shop problem with ordered machinesMinimizing makespan in an ordered flow shop with machine-dependent processing timesProportionate Flow Shop Scheduling with RejectionTwo-machine flow shop scheduling problem with an outsourcing optionA note on makespan minimization in proportionate flow shopsMinimizing tardy jobs in a flowshop with common due dateNon-permutation flow shop scheduling with order acceptance and weighted tardinessFlowshop sequencing problem with ordered processing time matrices: A general caseOnline scheduling of ordered flow shopsA note on the proportionate flow shop with a bottleneck machineFlow-shops with a dominant machineAnalysis of flow shop scheduling anomaliesIncomplete information and multiple machine queueing problemsMakespan minimization for the \(m\)-machine ordered flow shop scheduling problemFlow shops with machine maintenance: ordered and proportionate casesFlow shops with reentry: reversibility properties and makespan optimal schedulesTwo-Machine Ordered Flow Shop Scheduling with Generalized Due DatesThe three-machine proportionate flow shop problem with unequal machine speedsThe evolution of schematic representations of flow shop scheduling problemsThree-stage ordered flow shops with either synchronous flow, blocking or no-idle machinesMinimizing the total weighted completion time in a two-machine proportionate flow shop with different machine speedsReduction of job-shop problems to flow-shop problems with precedence constraintsProportionate flow shop: New complexity results and models with due date assignmentAn Ordered Flow Shop with Two AgentsOptimal streaming of a single job in a two-stage flow shopLot streaming in open shopsProduction scheduling with applications in the printing industry




This page was built for publication: Flowshop Sequencing Problem with Ordered Processing Time Matrices