Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Planning Horizons for the Dynamic Lot Size Model: Zabel vs. Protective Procedures and Computational Results - MaRDI portal

Planning Horizons for the Dynamic Lot Size Model: Zabel vs. Protective Procedures and Computational Results

From MaRDI portal
Publication:4079305

DOI10.1287/opre.23.4.711zbMath0317.90028OpenAlexW2168795829MaRDI QIDQ4079305

Thomas E. Morton, Rolf A. Lundin

Publication date: 1975

Published in: Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1287/opre.23.4.711




Related Items (36)

An effective algorithm for the capacitated single item lot size problemCapacity expansion with alternative technology choicesPlanning horizons for capacity expansionError bound for the dynamic lot size model with backloggingComputing minimal forecast horizons: an integer programming approachDecision/forecast horizon results for a single facility dynamic location/relocation problemMinimizing the error bound for the dynamic lot size modelPlanning horizons for multi-item hierarchical production scheduling problems: A heuristic search procedureA forward algorithm and planning horizon procedure for the production smoothing problem without inventoryEyeballing heuristics for dynamic lot sizing problems with rolling horizonsDegeneracy in infinite horizon optimizationDynamic lot-sizing model under perishability, substitution, and limited storage capacityForecast horizon of dynamic lot size model for perishable inventory with minimum order quantitiesLot-trees: A unifying view and efficient implementation of forward procedures for the dynamic lot-size problemPlanning horizons for manpower planning. A theoretical analysisA survey of dynamic network flowsMaster production schedule time interval strategies in make-to-order supply chains¶Remanufacturing planning for the reverse Wagner/Whitin modelsA concave cost stochastic replacement problem.A concave cost multimachine replacement problem with an expected breakthrough.Comparative study of dynamic lot sizing heuristics with backloggingForecast horizon for dynamic lot sizing model under product substitution and perishable inventoriesSelection, acquisition, and allocation of manufacturing technology in a multi-period environmentDynamic lot-sizing model with demand time windows and speculative cost structureA branch and bound algorithm for a single item nonconvex dynamic lot sizing problem with capacity constraintsDecision horizons in multistage dynamical lot size planning.Decision and forecast horizons in a stochastic environment: A surveyA forward branch-and-search algorithm and forecast horizon results for the changeover scheduling problemExact and heuristic algorithms for data sets reconstructionA multi-period profit maximizing model for retail supply chain management: An integration of demand and supply-side mechanismsSingle item lot sizing problemsA novel decomposition approach for on-line lot-sizing.Dynamic lot-sizing with price changes and price-dependent holding costsInventory planning in a deterministic environment: Continuous time model with concave costsA dynamic production planning and scheduling algorithm for two products processed on one lineSensitivity analysis of the economic lot-sizing problem




This page was built for publication: Planning Horizons for the Dynamic Lot Size Model: Zabel vs. Protective Procedures and Computational Results