Scheduling of Work Forces Required in Continuous Operations Under Alternative Labor Policies
From MaRDI portal
Publication:4082535
DOI10.1287/mnsc.22.5.597zbMath0319.90029OpenAlexW2051810421MaRDI QIDQ4082535
J. M. Lowerre, William S. Brownell
Publication date: 1976
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.22.5.597
Related Items (8)
Cyclic scheduling of offweekends ⋮ Working set generation methods for labor tour scheduling ⋮ Optimum manpower models for a production system with varying production rates ⋮ Single-shift off-day scheduling of a hierarchical workforce with variable demands ⋮ A resource type analysis of the integrated project scheduling and personnel staffing problem ⋮ The effect of workers with different capabilities on customer delay ⋮ An algorithm for single shift scheduling of hierarchical workforce ⋮ Using compressed workweeks to save labour cost
This page was built for publication: Scheduling of Work Forces Required in Continuous Operations Under Alternative Labor Policies