An improved branch and bound procedure forn ×m flow shop problems
From MaRDI portal
Publication:4085478
DOI10.1002/NAV.3800220412zbMath0322.90030OpenAlexW2033786831MaRDI QIDQ4085478
Abdul Wadood Khan, Shrikant S. Panwalkar
Publication date: 1975
Published in: Naval Research Logistics Quarterly (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/nav.3800220412
Numerical mathematical programming methods (65K05) Integer programming (90C10) Deterministic scheduling theory in operations research (90B35)
Related Items (3)
Minimizing Mean Completion Time for Special Flowshop Problems ⋮ A branch-and-bound algorithm with fuzzy inference for a permutation flowshop scheduling problem ⋮ Flowshop/no-idle scheduling to minimize total elapsed time
This page was built for publication: An improved branch and bound procedure forn ×m flow shop problems