Project Scheduling with Resource Constraints Using Branch and Bound Methods
From MaRDI portal
Publication:4093214
DOI10.1057/jors.1976.61zbMath0327.90014OpenAlexW2001110051MaRDI QIDQ4093214
N. A. J. Hastings, Robert J. Willis
Publication date: 1976
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/jors.1976.61
Numerical mathematical programming methods (65K05) Integer programming (90C10) Deterministic scheduling theory in operations research (90B35)
Related Items (1)
This page was built for publication: Project Scheduling with Resource Constraints Using Branch and Bound Methods