Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
scientific article; zbMATH DE number 3534262 - MaRDI portal

scientific article; zbMATH DE number 3534262

From MaRDI portal

zbMath0342.90020MaRDI QIDQ4110786

Gary E. Whitehouse

Publication date: 1973


Title: zbMATH Open Web Interface contents unavailable due to conflicting licenses.



Related Items

GERT models in an educational institution, An analytical method for cost analysis in multi-stage supply chains: a stochastic network model approach, Controlled alternative activity networks for project management, A stochastic network formulation for complex sequential processes, Recent advances in temporal analysis of GERT networks, Application of fuzzy distributions on project management, Activity nets: A guided tour through some recent developments, Modelling high-school education systems in Saudi Arabia using the GERT technique, Development of GERT model for precommissioning/commissioning of water treatment plant, Business process modelling with stochastic networks, A new algorithm for finding the shortest path between a specified pair of nodes in a graph of nonnegative arcs, Smooth, Stochastisches PERT — Eine vergleichende Untersuchung über die Effizienz eines Verfahrens zur stochastischen Projektplanung, Conditional corrective action plan for three attribute classes, Flowgraph models: a Bayesian case study in construction engineering, Kapazitätsplanung in Netzwerken. Ein Überblick über neuere Modelle und Verfahren. (Resource-constrained project planning in networks. A survey on new models and methods), Strict consecutive\(k\)-out-of-\(n\:F\) system: GERT analysis, On the temporal analysis of special GERT networks using a modified Markov renewal process, Project scheduling by special GERT networks, Using stochastic decision networks to assess costs and completion times of refurbishment work in construction