scientific article; zbMATH DE number 3534262
From MaRDI portal
zbMath0342.90020MaRDI QIDQ4110786
Publication date: 1973
Title: zbMATH Open Web Interface contents unavailable due to conflicting licenses.
Programming involving graphs or networks (90C35) Extremal problems in graph theory (05C35) Stochastic network models in operations research (90B15) Reliability, availability, maintenance, inspection in operations research (90B25) Deterministic network models in operations research (90B10) Inventory, storage, reservoirs (90B05) General systems (93A10) Research exposition (monographs, survey articles) pertaining to operations research and mathematical programming (90-02) Special processes (60Kxx)
Related Items
GERT models in an educational institution, An analytical method for cost analysis in multi-stage supply chains: a stochastic network model approach, Controlled alternative activity networks for project management, A stochastic network formulation for complex sequential processes, Recent advances in temporal analysis of GERT networks, Application of fuzzy distributions on project management, Activity nets: A guided tour through some recent developments, Modelling high-school education systems in Saudi Arabia using the GERT technique, Development of GERT model for precommissioning/commissioning of water treatment plant, Business process modelling with stochastic networks, A new algorithm for finding the shortest path between a specified pair of nodes in a graph of nonnegative arcs, Smooth, Stochastisches PERT — Eine vergleichende Untersuchung über die Effizienz eines Verfahrens zur stochastischen Projektplanung, Conditional corrective action plan for three attribute classes, Flowgraph models: a Bayesian case study in construction engineering, Kapazitätsplanung in Netzwerken. Ein Überblick über neuere Modelle und Verfahren. (Resource-constrained project planning in networks. A survey on new models and methods), Strict consecutive\(k\)-out-of-\(n\:F\) system: GERT analysis, On the temporal analysis of special GERT networks using a modified Markov renewal process, Project scheduling by special GERT networks, Using stochastic decision networks to assess costs and completion times of refurbishment work in construction