Workforce Scheduling with Cyclic Demands and Day-Off Constraints
From MaRDI portal
Publication:4149197
DOI10.1287/mnsc.24.2.161zbMath0372.90064OpenAlexW2066162644MaRDI QIDQ4149197
Kenneth R. Baker, Michael J. Magazine
Publication date: 1977
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.24.2.161
Related Items (16)
Cyclic scheduling of offweekends ⋮ Single-shift off-day scheduling of a hierarchical workforce with variable demands ⋮ A spreadsheet optimization system for library staff scheduling ⋮ On the complexity of manpower shift scheduling ⋮ A resource type analysis of the integrated project scheduling and personnel staffing problem ⋮ Unnamed Item ⋮ Solving the multi-objective nurse scheduling problem with a weighted cost function ⋮ A heuristic procedure for the crew rostering problem ⋮ A Novel Approach for the Nurse Scheduling Problem ⋮ A sequential integer programming method for discontinuous labor tour scheduling ⋮ An algorithm for single shift scheduling of hierarchical workforce ⋮ Scheduling staff using mixed integer programming ⋮ A decomposed branch-and-price procedure for integrating demand planning in personnel staffing problems ⋮ Designing an annual leave scheduling policy: case of a financial center ⋮ A 4-DAY OR A 3-DAY WORKWEEKS SCHEDULING PROBLEM WITH A GIVEN WORKFORCE SIZE ⋮ Using compressed workweeks to save labour cost
This page was built for publication: Workforce Scheduling with Cyclic Demands and Day-Off Constraints