The Effect of Short Production Runs on CSP-1
From MaRDI portal
Publication:4153452
DOI10.2307/1267695zbMath0376.62010OpenAlexW4247325728MaRDI QIDQ4153452
Publication date: 1977
Full work available at URL: https://doi.org/10.2307/1267695
Related Items (4)
Minimum average fraction inspected for short-run CSP-1 plan ⋮ Expected Cost for Continuous Sampling Plans ⋮ Short-run contexts and imperfect testing for continuous sampling plans ⋮ Average outgoing quality of CSP-C continuous sampling plan under short run production processes
This page was built for publication: The Effect of Short Production Runs on CSP-1