Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem
From MaRDI portal
Publication:415556
DOI10.1007/s10732-010-9152-0zbMath1237.90100OpenAlexW2033611108MaRDI QIDQ415556
Vincent Van Peteghem, Mario Vanhoucke
Publication date: 8 May 2012
Published in: Journal of Heuristics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10732-010-9152-0
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (16)
Meta-heuristic solution with considering setup time for multi-skilled project scheduling problem ⋮ A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints ⋮ An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem ⋮ The impact of solution representations on heuristic net present value optimization in discrete time/cost trade-off project scheduling with multiple cash flow and payment models ⋮ A path-relinking algorithm for the multi-mode resource-constrained project scheduling problem ⋮ An analysis of network and resource indicators for resource-constrained project scheduling problem instances ⋮ Multi‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristic ⋮ A data-driven \textit{meta}-learning recommendation model for multi-mode resource constrained project scheduling problem ⋮ An updated survey of variants and extensions of the resource-constrained project scheduling problem ⋮ A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem ⋮ Capital- and resource-constrained project scheduling with net present value optimization ⋮ Multi-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policies ⋮ An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances ⋮ A modified modeling approach and a heuristic procedure for the multi-mode resource constrained project scheduling problem with activity splitting ⋮ Hybrid particle swarm and differential evolution algorithm for solving multimode resource-constrained project scheduling problem ⋮ An innovative four-layer heuristic for scheduling multi-mode projects under multiple resource constrains
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Scatter search and bionomic algorithms for the aircraft landing problem
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting
- A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem
- Scheduling subject to resource constraints: Classification and complexity
- A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes
- A genetic algorithm for multi-mode resource constrained project scheduling problem
- PSPLIB -- a project scheduling problem library
- Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
- Resource-constrained project scheduling. Exact methods for the multi-mode case
- DSS for multiobjective project scheduling
- A local constraint based analysis approach to project scheduling under general resource constraints
- An exact algorithm for project scheduling with multiple modes
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.
- Resource-constrained project scheduling: Notation, classification, models, and methods
- An evaluation of the adequacy of project network generators with systematically sampled networks
- Rangen: A random network generator for activity-on-the-node networks
- A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
- A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling
- Principles of scatter search
- A Branch-and-Cut Procedure for the Multimode Resource-Constrained Project-Scheduling Problem
- Scheduling Resource-Constrained Projects Competitively at Modest Memory Requirements
- Phase transitions in project scheduling
- Project scheduling: The effects of problem structure on heuristic performance
- Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation
- Resource-constrained project scheduling by simulated annealing
- Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms
- An Experimental Investigation and Comparative Evaluation of Production Line Balancing Techniques
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Resource-constrained project scheduling: A heuristic for the multi-mode case
- Project scheduling with multiple modes: A genetic algorithm
- Simulated annealing for multi-mode resource-constrained project scheduling
This page was built for publication: Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem