Manpower Scheduling With Variable Demands And Alternate Weekends Off
From MaRDI portal
Publication:4165122
DOI10.1080/03155986.1978.11731694zbMath0384.90056OpenAlexW49683544MaRDI QIDQ4165122
Publication date: 1978
Published in: INFOR: Information Systems and Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/03155986.1978.11731694
Related Items (8)
Cyclic scheduling of offweekends ⋮ Single-shift off-day scheduling of a hierarchical workforce with variable demands ⋮ Preference scheduling for nurses using column generation ⋮ A note on a single-shift days-off scheduling problem with sequence-dependent labor costs ⋮ Nurse rostering problems -- a bibliographic survey. ⋮ An algorithm for single shift scheduling of hierarchical workforce ⋮ Cyclic and non-cyclic scheduling of 12h shift nurses by network programming ⋮ A generalized linear programming model for nurse scheduling
This page was built for publication: Manpower Scheduling With Variable Demands And Alternate Weekends Off