Analysis of the Earliest Due Date Scheduling Rule in Queueing Systems
From MaRDI portal
Publication:4171398
DOI10.1287/moor.2.2.145zbMath0389.60075OpenAlexW2147344343MaRDI QIDQ4171398
Publication date: 1977
Published in: Mathematics of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/moor.2.2.145
Deterministic scheduling theory in operations research (90B35) Queueing theory (aspects of probability theory) (60K25)
Related Items (9)
Analysis of a discrete-time queue with time-limited overtake priority ⋮ Probability modelling across the continents ⋮ Impact of priority sequencing decisions on on-time probability and expected tardiness of orders in make-to-order production systems with external due-dates ⋮ History of Queueing Theory in Canada Prior to 1980 ⋮ Due-date-based performance measures for queuing models ⋮ A first passage time problem for spectrally positive Lévy processes and its application to a dynamic priority queue ⋮ Lowest priority waiting time distribution in an accumulating priority Lévy queue ⋮ Strategic bidding in an accumulating priority queue: equilibrium analysis ⋮ An approach to production planning and scheduling in cyclically scheduled manufacturing systems
This page was built for publication: Analysis of the Earliest Due Date Scheduling Rule in Queueing Systems