A general approach for optimizing regular criteria in the job-shop scheduling problem

From MaRDI portal
Publication:418093

DOI10.1016/j.ejor.2011.01.046zbMath1237.90093OpenAlexW2018085234MaRDI QIDQ418093

C. Lahlou, Yazid Mati, Stéphane Dauzère-Pérès

Publication date: 14 May 2012

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2011.01.046




Related Items (24)

The no-wait job shop with regular objective: a method based on optimal job insertionJob-shop local-search move evaluation without direct consideration of the criterion's valueConfiguration and the advantages of the shifting bottleneck procedure for optimizing the job shop total weighted tardiness scheduling problemA study on local search neighborhoods for the job shop scheduling problem with total weighted tardiness objectiveShifting bottleneck scheduling for total weighted tardiness minimization -- a computational evaluation of subproblem and re-optimization heuristicsHeuristic approaches for scheduling jobs in large-scale flexible job shopsA neighborhood for complex job shop scheduling problems with regular objectivesAccelerating the calculation of makespan used in scheduling improvement heuristicsEnhancing local search algorithms for job shops with MIN-sum objectives by approximate move evaluationA general efficient neighborhood structure framework for the job-shop and flexible job-shop scheduling problemsMaximizing the service level on the makespan in the stochastic flexible job-shop scheduling problemA PMBGA to optimize the selection of rules for job shop scheduling based on the Giffler-Thompson algorithmEnergy cost efficient scheduling in flexible job-shop manufacturing systemsA batch-oblivious approach for complex job-shop scheduling problemsAn exact approach for single machine subproblems in shifting bottleneck procedures for job shops with total weighted tardiness objectiveImportance of verifying queue model assumptions before planning with simulation softwareMultiobjective optimization for complex flexible job-shop scheduling problemsExtended GRASP for the job shop scheduling problem with total weighted tardiness objectiveThe job shop scheduling problem with convex costsAn efficient Pareto approach for solving the multi-objective flexible job-shop scheduling problem with regular criteriaNeighbourhood generation mechanism applied in simulated annealing to job shop scheduling problemsA tabu search algorithm to minimize total weighted tardiness for the job shop scheduling problemFair optimization and networks: a surveyOn the optimal modeling and evaluation of job shops with a total weighted tardiness objective: constraint programming vs. mixed integer programming


Uses Software


Cites Work




This page was built for publication: A general approach for optimizing regular criteria in the job-shop scheduling problem