Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates
From MaRDI portal
Publication:421585
DOI10.1016/J.EJOR.2011.03.006zbMath1237.90069OpenAlexW2054151117WikidataQ57517573 ScholiaQ57517573MaRDI QIDQ421585
Stefan Minner, Klaus Altendorfer
Publication date: 14 May 2012
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2011.03.006
Related Items (3)
Influence of order acceptance policies on optimal capacity investment with stochastic customer required lead times ⋮ Capacity and lead-time management when demand for service is seasonal and lead-time sensitive ⋮ Impact of priority sequencing decisions on on-time probability and expected tardiness of orders in make-to-order production systems with external due-dates
Cites Work
- Advance demand information and a restricted production capacity: on the optimality of order base-stock policies
- Integrated capacity and inventory management with capacity acquisition lead times
- Trade-off between capacity invested and inventory needed
- Design of manufacturing systems using queueing models
- The value of advance demand information in production/inventory systems
- The effect of foreknowledge of demand in case of a restricted capacity: the single-stage, single-product case
- On the tradeoff between optimal order-base-stock levels and demand lead-times
- Planning order releases for an assembly system with random operation times
- An analytical model for service level and tardiness in a single machine MTO production system
- Managing Capacity and Inventory Jointly in Manufacturing Systems
- Simultaneous Capacity and Production Management of Short-Life-Cycle, Produce-to-Stock Goods Under Stochastic Demand
- Analysis, Design, and Control of Queueing Systems
- Necessary and Sufficient Conditions for Delay Moments in FIFO Multiserver Queues with an Application Comparing s Slow Servers with One Fast One
- Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs
- An Application of Queueing Theory to Reservation Newtorks
- A Classified Bibliography of Research on Optimal Design and Control of Queues
- Setting WIP levels with statistical throughput control (STC) in CONWIP production lines
- Optimal Leadtimes Planning in a Serial Production System
- Several Results on the Design of Queueing Systems
- Safety Stock versus Safety Time in MRP Controlled Production Systems
- On a Congestion Problem in an Aircraft Factory
- Some Inequalities for Parallel-Server Queues
- On the Optimality of Single-Server Queuing Systems
- Customer-Order Information, Leadtimes, and Inventories
- Letter to the Editor—The Output of an M/G/∞ Queuing System is Poisson
- Multi-server, Finite Waiting Room,M/G/c/KOptimization Models
This page was built for publication: Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates