Discrete-time, economic lot scheduling problem on multiple, non-identical production lines

From MaRDI portal
Publication:421620

DOI10.1016/j.ejor.2011.05.053zbMath1237.90070OpenAlexW1967703211MaRDI QIDQ421620

Ramesh Bollapragada, Marco Ghirardi, Frederico Della Croce

Publication date: 14 May 2012

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2011.05.053






Cites Work


This page was built for publication: Discrete-time, economic lot scheduling problem on multiple, non-identical production lines