AGV dispatching
From MaRDI portal
Publication:4230049
DOI10.1080/00207549608904893zbMath0923.90074OpenAlexW4242104146MaRDI QIDQ4230049
Publication date: 1 March 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549608904893
performance measuresqueue lengthjob completion timeautomatic guided vehicleAGV dispatching ruleload waiting time
Related Items
Strategies for dispatching AGVs at automated seaport container terminals ⋮ A review of some issues and identification of some barriers in the implementation of FMS ⋮ Scheduling and routing algorithms for AGVs: A survey ⋮ Simultaneous job input sequencing and vehicle dispatching in a single-vehicle automated guided vehicle system: a heuristic branch-and-bound approach coupled with a discrete events simulation model ⋮ Effective vehicle dispatching method minimising the blocking and delivery times in automatic material handling systems of 300 mm semiconductor fabrication ⋮ An MILP for scheduling problems in an FMS with one vehicle ⋮ A review of design and control of automated guided vehicle systems
Cites Work