Modelling the load levelling problem in master production scheduling for MRP systems
From MaRDI portal
Publication:4230072
DOI10.1080/00207549608904914zbMath0924.90071OpenAlexW2058692864WikidataQ126251562 ScholiaQ126251562MaRDI QIDQ4230072
Manuel Laguna, Belarmino Adenso-Díaz
Publication date: 1 March 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549608904914
Cites Work
This page was built for publication: Modelling the load levelling problem in master production scheduling for MRP systems