An evaluation of group scheduling heuristics in a flow-line manufacturing cell
From MaRDI portal
Publication:4230116
DOI10.1080/00207549608904945zbMath0946.90547OpenAlexW2152323712MaRDI QIDQ4230116
Publication date: 1 March 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549608904945
Related Items (11)
Non-exhaustive family based dispatching heuristics–exploiting variances of processing and set-up times ⋮ Permutation and non-permutation schedules for the flowline manufacturing cell with sequence dependent family setups ⋮ Dispatching rule evaluation in flexible manufacturing systems by a new fuzzy decision model with possibilistic-statistical uncertainties ⋮ Flexibility analysis of a surface mount technology electronic assembly plant: An integrated model using simulation ⋮ A comprehensive review of flowshop group scheduling literature ⋮ Flow shop batching and scheduling with sequence-dependent setup times ⋮ Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times ⋮ Reexamination of processing time uncertainty ⋮ Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times ⋮ Family-based dispatching: anticipating future jobs ⋮ Scheduling in cellular manufacturing systems: an heuristic approach
Cites Work
This page was built for publication: An evaluation of group scheduling heuristics in a flow-line manufacturing cell