Part-mix allocation in a hybrid manufacturing system with a flexible manufacturing cell and a conventional jobshop
From MaRDI portal
Publication:4230150
DOI10.1080/00207549608904969zbMath0947.90544OpenAlexW2076171697MaRDI QIDQ4230150
Publication date: 1 March 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549608904969
Related Items (1)
Cites Work
- Dimensions of manufacturing automation
- Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems
- An integrated inventory model for a single product and its raw materials
- The Shifting Bottleneck Procedure for Job Shop Scheduling
- Models Arising from a Flexible Manufacturing Machine, Part II: Minimization of the Number of Switching Instants
- Modelling and solving an FMS part selection problem
- Job Shop Scheduling by Simulated Annealing
- A Survey of Scheduling Rules
This page was built for publication: Part-mix allocation in a hybrid manufacturing system with a flexible manufacturing cell and a conventional jobshop