Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Formulation and solution of the drum-buffer-rope constraint scheduling problem ( DBRCSP)

From MaRDI portal
Publication:4230239
Jump to:navigation, search

DOI10.1080/00207549608905035zbMath0930.90032OpenAlexW1965069837MaRDI QIDQ4230239

Braden J. Carlson, C. A. Lettiere, Wendell P. III Simpson, B. A. Jun. Mediate, S. W. James, Jacob V. Jun. Simons

Publication date: 1 March 1999

Published in: International Journal of Production Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1080/00207549608905035


zbMATH Keywords

constraint scheduling


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35) Production models (90B30)


Related Items (3)

Study on constraint scheduling algorithm for job shop problems with multiple constraint machines ⋮ Impact of scheduling free goods on the throughput performance of a manufacturing operation ⋮ A DBR scheduling method for manufacturing environments with bottleneck re-entrant flows



Cites Work

  • The Shifting Bottleneck Procedure for Job Shop Scheduling
  • A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
  • The impact of learning rate and constraints on production line performance


This page was built for publication: Formulation and solution of the drum-buffer-rope constraint scheduling problem ( DBRCSP)

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:4230239&oldid=18108534"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 6 February 2024, at 16:18.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki