The impact of lot sizing and sequencing on manufacturing performance in a two-stage hybrid flow shop
From MaRDI portal
Publication:4230289
DOI10.1080/00207549608905076zbMath0927.90042OpenAlexW1996100744MaRDI QIDQ4230289
No author found.
Publication date: 1 March 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549608905076
Related Items (5)
Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective ⋮ Two-stage, single-lot, lot streaming problem for a \(1+2\) hybrid flow shop ⋮ Single-job lot streaming in \(m - 1\) two-stage hybrid flowshops ⋮ Influence of capacity- and time-constrained intermediate storage in two-stage food production systems ⋮ The hybrid flow shop scheduling problem
Cites Work
This page was built for publication: The impact of lot sizing and sequencing on manufacturing performance in a two-stage hybrid flow shop