A simulation analysis for two-level sequence-scheduling for just-in-time (JIT) mixed-model assembly lines
From MaRDI portal
Publication:4230296
DOI10.1080/00207549608905080zbMath0928.90015OpenAlexW2002815156MaRDI QIDQ4230296
Yasuhiro Monden, Henry Aigbedo
Publication date: 20 January 2000
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549608905080
Related Items (4)
Optimal production sequencing problem to minimise line stoppage time in a mixed-model assembly line ⋮ On bills of materials structure and optimum product-level smoothing of parts usage in JIT assembly systems ⋮ Sequencing mixed-model assembly lines: survey, classification and model critique ⋮ A transformed two-stage method for reducing the part-usage variation and a comparison of the product-level and part-level solutions in sequencing mixed-model assembly lines
Cites Work
- A dynamic programming algorithm for scheduling mixed-model, just-in-time production systems
- A Note on “Level Schedules for Mixed-Model Assembly Lines in Just-in-Time Production Systems”
- Note—Sequencing JIT Mixed-Model Assembly Lines
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems
- An analytic framework for sequencing mixed model assembly lines
- A comparative analysis of sequencing procedures for mixed-model assembly lines in a just-in-time production system
This page was built for publication: A simulation analysis for two-level sequence-scheduling for just-in-time (JIT) mixed-model assembly lines