Formulations and heuristics for scheduling in a buffer-constrained flowshop and flowline-based manufacturing cell with different buffer-space requirements for jobs: Part 1
From MaRDI portal
Publication:4230318
DOI10.1080/00207549608905100zbMath0919.90077OpenAlexW4233978341MaRDI QIDQ4230318
B. Sharadapriyadarshini, Chandrasekharan Rajendran
Publication date: 1 March 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549608905100
permutation flowshopbuffer-constrained flowshopflowline-based manufacturing celltime-tabling of jobs
Related Items
Cites Work
- Unnamed Item
- A new heuristic method for the flow shop sequencing problem
- Optimal two- and three-stage production schedules with setup times included
- Flowshop sequencing problems with limited buffer storage
- An ideal seed non-hierarchical clustering algorithm for cellular manufacturing
- ZODIAC—an algorithm for concurrent formation of part-families and machine-cells
- An Evaluation of Flow Shop Sequencing Heuristics
- A Heuristic Algorithm for the n Job, m Machine Sequencing Problem