Joint determination of the production lot size and number of shipments for EPQ model with rework
From MaRDI portal
Publication:424031
DOI10.3390/MCA16020317zbMath1238.90008OpenAlexW2187745864MaRDI QIDQ424031
Chun-Lin Chiu, Chia-Ling Chung, Singa Wang Chiu, Dah-Chuan Gong
Publication date: 30 May 2012
Published in: Mathematical \& Computational Applications (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.3390/mca16020317
Related Items (3)
A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering ⋮ Joint determination of the lot size and number of shipments for a family of integrated vendor–buyer systems considering defective products ⋮ Determining optimal price, replenishment lot size and number of shipments for an EPQ model with rework and multiple shipments
This page was built for publication: Joint determination of the production lot size and number of shipments for EPQ model with rework