Scheduling a two-machine flowshop with travel times to minimize maximum lateness
From MaRDI portal
Publication:4245165
DOI10.1080/002075497195948zbMath0940.90509OpenAlexW2149033798MaRDI QIDQ4245165
James W. Stevens, Douglas D. Gemmill
Publication date: 19 July 2000
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075497195948
Related Items (6)
Machine scheduling with job delivery coordination ⋮ A comparison of priority rules for minimizing the maximum lateness in tree data gathering networks ⋮ Machine scheduling with transportation considerations ⋮ Machine scheduling with deliveries to multiple customer locations ⋮ Approximation solutions for the cutting stock `portfolio' problem ⋮ Preemptive scheduling on identical machines with delivery coordination to minimize the maximum delivery completion time
This page was built for publication: Scheduling a two-machine flowshop with travel times to minimize maximum lateness