Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system
From MaRDI portal
Publication:4245250
DOI10.1080/002075497195498zbMath0949.90622OpenAlexW2099990933MaRDI QIDQ4245250
Publication date: 8 June 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075497195498
Related Items (8)
An explicit analysis of the lead time syndrome: stability condition and performance evaluation ⋮ Inventory management practices and their implications on perceived planning performance ⋮ Optimal supply planning in MRP environments for assembly systems with random component procurement times ⋮ A typology and literature review on stochastic multi-echelon inventory models ⋮ Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times ⋮ Generalized newsboy model to compute the optimal planned lead times in assembly systems ⋮ Lot size approximation based on minimising total delay in a shop with multi-assembly products ⋮ MRP performance effects due to forecast bias and demand uncertainty
This page was built for publication: Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system