A parallel station heuristic for the mixed-model production line balancing problem
From MaRDI portal
Publication:4245365
DOI10.1080/002075497194309zbMath0942.90540OpenAlexW2131638366MaRDI QIDQ4245365
No author found.
Publication date: 21 August 2000
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075497194309
Related Items
U-shaped assembly line layouts and their impact on labor productivity: an experimental study ⋮ A classification of assembly line balancing problems ⋮ Supporting offshoring and nearshoring decisions for mass customization manufacturing processes ⋮ An efficient branch and bound algorithm for assembly line balancing problems with parallel multi-manned workstations ⋮ The stochastic U-line balancing problem: a heuristic procedure ⋮ Balancing of manufacturing systems with complex configurations for delayed product differentiation ⋮ A network model for parallel line balancing problem ⋮ Using distributed search methods for balancing mixed-model assembly lines in the automotive industry ⋮ A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstations ⋮ Multi-objective assembly line balancing via a modified ant colony optimization technique ⋮ A survey on problems and methods in generalized assembly line balancing
This page was built for publication: A parallel station heuristic for the mixed-model production line balancing problem