Scheduling in a Kanban-controlled flowshop with dual blocking mechanisms and missing operations for part-types
From MaRDI portal
Publication:4245368
DOI10.1080/002075497194327zbMath0942.90549OpenAlexW2090233436MaRDI QIDQ4245368
B. Sharadapriyadarshini, Chandrasekharan Rajendran
Publication date: 21 August 2000
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075497194327
This page was built for publication: Scheduling in a Kanban-controlled flowshop with dual blocking mechanisms and missing operations for part-types