Product structure complexity and scheduling of operations in recoverable manufacturing
From MaRDI portal
Publication:4245370
DOI10.1080/002075497194345zbMath0942.90538OpenAlexW2010904050MaRDI QIDQ4245370
Rajesh K. Srivastava, M. E. Kraus, V. Daniel R. jun. Guide
Publication date: 21 August 2000
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075497194345
Related Items (8)
The bullwhip effect in a manufacturing/remanufacturing supply chain under a price-induced non-standard ARMA(1,1) demand process ⋮ Performance of static priority rules for shared facilities in a remanufacturing shop with disassembly and reassembly ⋮ A label correcting algorithm for partial disassembly sequences in the production planning for end-of-life products ⋮ Characteristics of the research on reverse logistics (1995–2005) ⋮ Recycling procurement strategies with variable yield suppliers ⋮ On the cooperation of recycling operations ⋮ A GENERALIZED STOCHASTIC PETRI-NET MODEL FOR PERFORMANCE ANALYSIS AND ALLOCATION OPTIMIZATION OF A PARTICULAR REPAIR SYSTEM ⋮ Two-stage make-to-order remanufacturing with service-level constraints
This page was built for publication: Product structure complexity and scheduling of operations in recoverable manufacturing