Multi-cyclic flow shop scheduling: An application in multi-stage, multiproduct production processes
From MaRDI portal
Publication:4245378
DOI10.1080/002075497194093zbMath0946.90521OpenAlexW2072586631MaRDI QIDQ4245378
Publication date: 5 October 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075497194093
Related Items (6)
Two hybrid meta-heuristics for the finite horizon ELSP in flexible flow lines with unrelated parallel machines ⋮ The cycle time distribution ⋮ A genetic algorithm for solving the economic lot scheduling problem in flow shops ⋮ A heuristic approach for determining lot sizes and schedules using power-of-two policy ⋮ The two-group heuristic to solve the multi-product, economic lot sizing and scheduling problem in flow shops. ⋮ The multi-product, economic lot-sizing problem in flow shops: The powers-of-two heuristic
This page was built for publication: Multi-cyclic flow shop scheduling: An application in multi-stage, multiproduct production processes