Formulations and heuristics for scheduling in a Kanban flowshop to minimize the sum of weighted flowtime, weighted tardiness and weighted earliness of containers
From MaRDI portal
Publication:4245477
DOI10.1080/002075499191445zbMath0951.90529OpenAlexW1970238346MaRDI QIDQ4245477
Publication date: 8 June 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075499191445
Related Items (3)
Branch-and-bound algorithms for minimizing total earliness and tardiness in a two-machine permutation flow shop with unforced idle allowed ⋮ An assembly-type supply chain system controlled by kanbans under a just-in-time delivery policy ⋮ A study on the performance of scheduling rules in buffer-constrained dynamic flowshops
This page was built for publication: Formulations and heuristics for scheduling in a Kanban flowshop to minimize the sum of weighted flowtime, weighted tardiness and weighted earliness of containers