Constraint time buffer determination model
From MaRDI portal
Publication:4245560
DOI10.1080/002075498193534zbMath0949.90652OpenAlexW2097462681WikidataQ56958360 ScholiaQ56958360MaRDI QIDQ4245560
No author found.
Publication date: 8 June 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075498193534
Related Items (4)
Joint optimisation of maintenance and buffer size in a manufacturing system ⋮ Improved customer satisfaction with a hybrid dispatching rule in semiconductor back-end factories ⋮ Determination of buffer sizes for drum–buffer–rope (DBR)-controlled production systems ⋮ Model to determine the backup capacity of a wafer foundry
This page was built for publication: Constraint time buffer determination model