Minimizing production flow time in a process and assembly job shop
From MaRDI portal
Publication:4245649
DOI10.1080/002075498192922zbMath0945.90563OpenAlexW2127894277MaRDI QIDQ4245649
Pius J. Egbelu, D. H. Cummings McKoy
Publication date: 1998
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075498192922
Related Items
Scheduling for two-stage production system with setup and assembly operations ⋮ Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures ⋮ Flow-shop scheduling with setup and assembly operations ⋮ Three-stage flow-shop scheduling with assembly operations to minimize the weighted sum of product completion times ⋮ Multi-objective optimisation in flexible assembly job shop scheduling using a distributed ant colony system