Production sequencing problem with re-entrant work flows and sequence dependent setup times
From MaRDI portal
Publication:4245659
DOI10.1080/002075498192616zbMath0945.90569OpenAlexW2138459382MaRDI QIDQ4245659
No author found.
Publication date: 9 October 2000
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075498192616
Related Items
A cloud based job sequencing with sequence-dependent setup for sheet metal manufacturing, A survey of scheduling problems with setup times or costs, Modelling and analysis of wafer fabrication scheduling via generalized stochastic Petri net and simulated annealing, Decomposition methods for reentrant flow shops with sequence-dependent setup times, Decentralised, multi-objective driven scheduling for reentrant shops: a conceptual development and a test case