Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Scheduling deteriorating jobs to minimize makespan - MaRDI portal

Scheduling deteriorating jobs to minimize makespan

From MaRDI portal
Publication:4248925

DOI<511::AID-NAV5>3.0.CO;2-6 10.1002/(SICI)1520-6750(199808)45:5<511::AID-NAV5>3.0.CO;2-6zbMath0936.90026OpenAlexW2039692353MaRDI QIDQ4248925

Steef L. van de Velde, Wiesław X. Kubiak

Publication date: 10 June 1999

Full work available at URL: https://doi.org/10.1002/(sici)1520-6750(199808)45:5<511::aid-nav5>3.0.co;2-6




Related Items (32)

A memetic algorithm for minimizing the total weighted completion time on a single machine under step-deteriorationMinimizing the total completion time in single-machine scheduling with step-deteriorating jobsComplexity analysis of job-shop scheduling with deteriorating jobsAn FPTAS for scheduling jobs with piecewise linear decreasing processing times to minimize makespanA note on scheduling on a single processor with speed dependent on a number of executed jobsA variant of the permutation flow shop model with variable processing timesParallel machine scheduling with time dependent processing timesA multiple-criterion model for machine scheduling with constant deteriorating jobsA concise survey of scheduling with time-dependent processing timesScheduling with time-dependent discrepancy timesA general variable neighborhood search for single-machine total tardiness scheduling problem with step-deteriorating jobsVariable neighborhood search for parallel machines scheduling problem with step deteriorating jobsA technical note: fully polynomial time approximation schemes for minimizing the makespan of deteriorating jobs with nonlinear processing timesScheduling jobs with a V-shaped time-dependent processing timeA local search algorithm: minimizing makespan of deteriorating jobs with relaxed agreeable weightsScheduling piecewise linear deteriorating jobs to minimize makespan in a two-machine flowshopSolution methods for scheduling problems with sequence-dependent deterioration and maintenance eventsParallel-machine scheduling with simple linear deterioration to minimize total completion timeSingle-machine scheduling with deteriorating jobsScheduling a single fire fighting resource with deteriorating fire suppression times and set-up timesA closed-form solution for the optimal release times for the \(F2|\) deteriorating jobs \(|\sum w_{j}c_{j}\) problemSingle machine scheduling with step-deteriorating processing timesConnected searching of weighted treesA note on single-machine makespan scheduling with deteriorating jobs and scheduled maintenanceAn approximation algorithm for parallel machine scheduling with simple linear deteriorationScheduling linear deteriorating jobs to minimize makespan with an availability constraint on a single machineA review of four decades of time-dependent scheduling: main results, new topics, and open problemsPreemptive repayment policy for multiple loansSCHEDULING PROPORTIONALLY DETERIORATING JOBS IN TWO-MACHINE OPEN SHOP WITH A NON-BOTTLENECK MACHINEStrongly polynomial FPTASes for monotone dynamic programsAutomatic Generation of FPTASes for Stochastic Monotone Dynamic Programs Made EasierA classification of dynamic programming formulations for offline deterministic single-machine scheduling problems




This page was built for publication: Scheduling deteriorating jobs to minimize makespan