Scheduling of Products with Common and Product-Dependent Components Manufactured at a Single Facility
From MaRDI portal
Publication:4273241
DOI10.1057/jors.1993.136zbMath0782.90058OpenAlexW2016582932MaRDI QIDQ4273241
No author found.
Publication date: 16 January 1994
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/jors.1993.136
Related Items
One-operator, two-machine open shop and flow shop problems with setup times for machines and weighted number of tardy jobs objective ⋮ Scheduling for fabrication and assembly in a two-machine flowshop with a fixed job sequence ⋮ Fabrication scheduling on a single machine to minimize the weighted sum of product completion time