Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Scheduling of Products with Common and Product-Dependent Components Manufactured at a Single Facility

From MaRDI portal
Publication:4273241
Jump to:navigation, search

DOI10.1057/jors.1993.136zbMath0782.90058OpenAlexW2016582932MaRDI QIDQ4273241

No author found.

Publication date: 16 January 1994

Published in: Journal of the Operational Research Society (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1057/jors.1993.136


zbMATH Keywords

production schedulingbranch-and-boundmean flow timebatch processessingle manufacturing facility


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35) Production models (90B30)


Related Items

One-operator, two-machine open shop and flow shop problems with setup times for machines and weighted number of tardy jobs objective ⋮ Scheduling for fabrication and assembly in a two-machine flowshop with a fixed job sequence ⋮ Fabrication scheduling on a single machine to minimize the weighted sum of product completion time



Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:4273241&oldid=18188706"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 6 February 2024, at 18:50.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki