Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem
From MaRDI portal
Publication:4274645
DOI10.1287/mnsc.39.5.616zbMath0783.90054OpenAlexW2028653550MaRDI QIDQ4274645
Could not fetch data.
Publication date: 2 January 1994
Published in: (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.39.5.616
Could not fetch data.
Could not fetch data.